  • 2016
    • Everett Public Schools
      • District Wide CCTV Safety and Security Project Expansion
        • I provided owner advocacy and design consulting services
      • Information Technologies Standards Update
        • I provided consulting services in the development of an updated Information Technologies Standard.
      • District Wide WiFi Expansion
        • I provided owner advocacy and design consulting services
      • Phone System Replacement
        • I provided owner advocacy and design consulting services
  • 2015
    • Everett Public Schools
      • District Wide CCTV Safety and Security Project Expansion
        • I provided owner advocacy and design consulting services Everett Public Schools
      • District Wide CCTV Safety and Security Project
        • I provided design review consulting services to verify the submitted design meets the Districts requirements. 
        • Oversight Project Management for these projects:
          • CCTV system installation and configuration for all the District schools
          • CCTV video management system installation and configuration in the District Data Center
          • Video storage installation and configuration in the District Data Center
          • RAVE system CCTV integration
  • 2014
    • Everett Public Schools
      • New Community Resource Center Building Project
        • I provided design review consulting services to verify the submitted design meets the Districts requirements. 
        • Data Center Design
        • Data Center Relocation Move Management
        • Oversight Project Management for these projects:
          • IT issues related to the Staff Relocation into the CRC Building
          • Phone System Upgrade
          • Voicemail System Upgrade
          • A/V system installation and configuration for the CRC Building
          • CCTV system installation and configuration for the CRC building
          • Data Center commissioning
          • Data Center relocation
      • District Wide CCTV Safety and Security Project
        • I provided design review consulting services to verify the submitted design meets the Districts requirements. 
        • Oversight Project Management for these projects:
          • CCTV system installation and configuration for all the District schools
          • CCTV video management system installation and configuration in the District Data Center
          • Video storage installation and configuration in the District Data Center
          • RAVE system CCTV integration
  • 2013
    • Everett Public Schools
      • New Community Resource Center Building Project
        • I provided design review consulting services to verify the submitted design meets the Districts requirements. 
        • Data Center Design
        • Data Center Relocation Move Management
    • Fred Hutchinson Cancer Research Center
      • OSP Aerial to underground for 1100 Eastlake Sky Bridge
        • I provided aerial to underground cable plant design
        • I provided customer advocate consulting services related to the development of the new underground pathways.
    • Roth Hill, LLC.
      • IT Consulting
        • DFS Consulting
        • Active Directory Consulting 
  • 2012
    • Everett Public Schools
      • New Community Resource Center Building Project
        • I provided design review consulting services to verify the submitted design meets the Districts requirements. 
        • Data Center Design
        • Data Center Relocation Move Management
    • Fred Hutchinson Cancer Research Center
      • 1100 Eastlake Lab and Data Center
        • I provided IT consulting and project Q/A services
      • G20 HPC Move
        • I provided data center load allocation design services
      • OSP Aerial to underground for 1100 Eastlake Sky Bridge
        • I provided aerial to underground cable plant design
        • I provided customer advocate consulting services related to the development of the new underground pathways.
      • Uganda Clinic
        • I provided design review services to verify the submitted design meets the clients requirements
    • Roth Hill, LLC.
      • IT Consulting
        • Backup System Consulting
        • Exchange upgrade
        • DFS Consulting
        • Active Directory Consulting
  • 2011
    • The City of Bothell
      • City Hall to PD Data Center Move Planning
        • I provided on going consulting services reviewing plans for the IT move. 
      • New City Hall
        • I provided consulting services as an owners advocate related to IT design issues for the new City Hall project.
    • Everett Public Schools
      • New Community Resource Center Building Project
        • I provided design review consulting services to verify the submitted design meets the Districts requirements. 
    • King County Library System
      • Service Center Data Center UPS Replacement
        • Provided project management services related to the implementation of a new UPS system for the Service Center Data Center
      • Service Center Data Center HVAC
        • Provided IT consulting services and owner advocacy services related to the investigation of options for HVAC upgrades for the Service Center Data Center
    • Roth Hill, LLC.
      • IT Consulting
        • Provided IT consulting services related to an upgrade to the network storage and backup systems.
        • Server Virtualization IT Consulting
  • 2010
    • The City of Bothell
      • City Hall to PD Data Center Move Planning
        • I provided on going consulting services reviewing plans for the IT move.
      • PD Server Room
        • I provided on going consulting services as the lead of the Design team for a project to expand the PD Server Room.
        • I managed the construction project for the establishment of an expanded data center in the PD.
    • D Hittle & Associates
      • As a sub-consultant I provided design services related to:
        • A submarine power cable project to serve Anderson Island
        • A metro fiber network in Spokane county
    • King County Library System
      • Service Center Data Center UPS Replacement
        • Provided consulting services related to the design of a new UPS system for the Service Center Data Center.
    • Northwest Kidney Center
      • I provided Data Center Design consulting services developing the criteria for a new data center being considered for construction at the Lake Forest Park facility.
    • Parametrix
      • Sumner office move to Puyallup
        • Provided consulting services for the design of the IT infrastructure for new office space in Puyallup.
  • 2009
    • The City of Bothell
      • City Hall to PD Data Center Move Planning
        • I provided consulting services reviewing plans for the IT move.
      • PD Server Room
        • I provided consulting services as the lead of the Design team for a project to expand the PD Server Room.
        • I managed the construction project for the establishment of an expanded data center in the PD.
      • City Hall Server Room
        • I provided consulting services assisting the City with the planning for the move of the City Hall IT systems into the new data center in the PD.
    • The City of Burien
      • City Hall cabling implementation project management
        • City Hall move
          • I provided consulting services to manage the move of the voice and data systems into new City Hall.
          • I managed the move of the City's fiber optic MAN into the new City Hall.
    • Everett Public Schools
      • New Administration Building Project
        • I provided design revie consulting services to verify the submitted design meets the Districts requirements.  The results of the review were presented as a Findings and Recommendations report.
    • Puyallup School District
      • Leased Fiber RFP Response Review
        • I provided consulting services related to the review of RFP responses for the project.
  • 2008
    • ACLU of Washington
      • Server Room
      • I provided consulting services related to HVAC issues in the server room.
    • Aronson Security Group
      • Server Room
      • I provided engineering and installation project management services for the server room in their new offices.
    • DREAL 2004
      • NetRiver Data Center
        • I provided consulting services for the sizing of the backup power generation system.
    • Snohomish PUD
      • Clearview to Bright Water Fiber Project
        • I provided consulting services for the communication fiber optic project connecting the Clearview and Brightwater substations.
    • The City of Bothell
      • New City Shop
        • I provided owner advocacy and design review services for the new City Shop project.
      • PD Server Room
        • I provided consulting services and developed a feasibility report related to the possible expansion of the PD server room.
        • I provided consulting services as the lead of the Design team for a project to expand the PD Server Room.
      • City Hall Server Room
        • I provided consulting services related to the possible relocation of the current City Hall server room.
    • The City of Burien
      • City Hall relocation move disaster recover planning
        • I continued to provided disaster recovery planning services related to moving the City Hall voice and data networks from a temporary space into the new City Hall.
      • City Hall cabling and relocation implementation project management
        • I continued to provided engineering services and implementation project management to relocate the City Hall voice and data networks into temporary space. Valley Medical Center 
      • New ER Tower
        • I provided owner advocacy and design review services for the new ER Tower project.
    • Washington State Departments of General Administration and Information Services
      • Capital Campus Medium Voltage Improvement Project
        • I provided consulting services for the communication duct bank improvements portion of the project.
  • 2007
    • Black Rock Cable
      • Fiber optic feasibility study
        • I provided feasibility study and route fielding service to Black Rock Cable for their proposed fiber optic route in the Arlington area.
    • Lakehaven Utility District
      • Office cabling upgrade and server room design and implementation project management
        • I provided engineering design services and implementation project management services for Lakehaven Utility District in the establishment of a new server room and the re-cabling of their corporate office in Federal Way. 
    • The City of Burien
      • City Hall relocation move disaster recover planning
        • I provided disaster recovery planning services related to moving the City Hall voice and data networks into temporary space.
      • City Hall cabling and relocation implementation project management
        • I provided engineering services and implementation project management to relocate the City Hall voice and data networks into temporary space.
    • Tulalip Tribes 
      • Conduit system design
        • I provided engineering services for the route selection and design of a conduit system connecting two of the Telecommunications facilities.
    • Washington Imaging Services
      • Server room design build and implementation project management Bellevue
        • I provided engineering and implementation project management for the new data center at the Bellevue facility.
  • 2006
    • Exotic Metals
      • WLAN design and deployment
        • I designed a WLAN network for a new manufacturing facility.
      • WLAN analysis
        • I provided WLAN network analysis services to determine intersystem interference between their data WLAN and their voice WLAN.
    • Fred Hutchinson Cancer Research Center
      • Fiber optic implementation project management
        • I provided design review and implementation project management services when FHCRC needed to connect two buildings with fiber optic cable transiting public right of way and contacting Seattle City Light utility poles.
    • Monroe School District
      • Fiber optic feasibility study
        • I assisted in a feasibility study for Monroe School District helping them gather data they will use in deciding to deploy a district fiber optic network.
      • Server room feasibility study
        • I assisted in a feasibility study for Monroe School District assessing sites for a new data center for the District.
    • Parametrix
      • Data center feasibility study
        • I conducted a feasibility study helping Parametrix decide to implement a data center in their new corporate office in Auburn.
      • Office cabling and data center design and implementation project management
        • I provided engineering and implementation project management services for the cabling of the new corporate office as well as the build out of the new corporate data center.
    • Perkins Coie
      • WLAN feasibility study
        • I conducted a feasibility study comparing offerings from three vendors to provide ubiquitous WLAN coverage for all of Perkins Coie’s offices.
    • Puyallup School District
      • Data Center design project
        • I provided engineering services and implementation project management services for the design and construction of the new District data center.
      • Fiber optic feasibility study
        • I assisted in developing a feasibility study that will be used by the District in deciding how to deploy a district fiber optic network.
    • The City of Burien
      • Public Works office design and implementation project management
        • I provided engineering services and implementation project management for the new Public Works office.
      • Senior Center relocation design and implementation project management
        • I provided engineering services and implementation project management for the relocation of the Senior Center into the Parks Department offices.
    • The City of Everett
      • Fiber cable relocation design and implementation project management Pacific Avenue
        • I provided engineering and implementation project management services for the re-route of fiber optic cable along Pacific Avenue.
  • 2005
    • King County Library System / City of Burien
      • Burien Library City Hall building project design and implementation project management
        • I provided engineering services for the design of the voice and data networks for KCLS and the City of Burien for the new building they will share in Burien.
    • Pacific Lumber and Shipping
      • Office cabling design and implementation project management
        • I provided engineering and implementation project management services for the cabling of their new office space.
      • Move management
        • I provided disaster recovery planning and move management for the move of their network to their new office space.
    • The City of Everett
      • Fiber cable design and implementation project management City Hall to Fire station
        • I provided engineering and implementation project management services for the extension of fiber optic cable from City Hall to the downtown fire station.
    • Washington Imaging Services
      • Server room design bid build and implementation project management Issaquah
        • I provided engineering oversight for the design and implementation project management of the new server room at the Issaquah facility.
  • 2004
    • Everett School District
      • Fiber optic feasibility study
        • I provided feasibility study assistance to the Everett School District enabling them to make a decision to deploy a district owned fiber optic network.
    • Washington State Department of Corrections
      • McNeil Island Corrections Center
        • I provided engineering oversight and implementation project management for the fiber optic portion of the Marine power cable replacement project.
      • Monroe Correctional Complex
        • I provided engineering and implementation project management services for:
          • the new Regional Training Center
          • the new Special Offender Unit Plant Maintenance Office
  • 2003
    • Kitsap Public Utility District
      • Fiber optic network design and implementation project management
        • I provided engineering and implementation project management services for Kitsap Public Utility District when they deployed a fiber network throughout Kitsap County.  My services included route selection, public right of way permit applications, and utility pole contact coordination with: Puget Sound Energy, Qwest, and Sprint.  I also managed the RFP process for installation vendor selection and provided installation project management and quality assurance inspections.  I also assisted KPUD with the design and implementation of four data centers along the route.
    • Washington State Department of Corrections
      • Stafford Creek Corrections Center
        • I provided engineering design review oversight services for the second phase of construction.
      • Washington State Penitentiary
        • I provided engineering services in the development of the RFP and implementation vendor selection for the North Complex Expansion Project.
  • 2002
    • Washington State Department of Corrections
      • Monroe Correctional Complex
        • I conducted a facility wide infrastructure site survey of the three correctional units at this facility to assess the infrastructure installation compared to the current infrastructure standards.  The result of this assessment was the initiation of a campus wide cable infrastructure replacement project.
      • Washington Corrections Center for Women
        • I provided engineering design review services for the cable replacement project at this facility.
      • Washington State Penitentiary
        • I provided engineering and implementation project management services for the renovation of the Intensive Management Unit.
    • Washington State Department of Social and Health Services
      • Special Commitment Center McNeil Island
        • I provided engineering implementation project management services for the move of the Special Commitment Center from the Special Offenders Unit at Monroe to a wing in the Main Institution on McNeil Island.
        • I provided engineering oversight for the design of the new Special Commitment Center project at the North Camp on McNeil Island.
  • 2001
    • Washington State Department of Corrections
      • Airway Heights Corrections Center
        • I conducted a facility wide infrastructure site survey of this facility to assess the installation compared to the current infrastructure standards.
      • Cedar Creek Corrections Center
        • I provided engineering and implementation project management for:
          • a new housing unit
          • a campus cable replacement project
          • a phone system upgrade for the facility
          • I provided engineering oversight and implementation for an entrance facility upgrade performed by Qwest.
      • Larch Corrections Center
        • I provided engineering and implementation project management for a new housing unit.
    • Monroe Correctional Complex
      • I provided engineering and implementation project management services for:
        • a new 400 bed minimum security facility
    • Stafford Creek Corrections Center
      • I provided engineering design review services for the initial construction project.
    • Washington State Penitentiary
      • I provided consulting, design, and disaster recovery planning services and implementation project management services for the phone system replacement project.
      • I provided disaster recovery consulting services and implementation project management for the relocation of the Qwest entrance facility for the campus.
    • Washington State Department of Information Services
      • K20 project
        • I provided engineering services and served as the point of contact for all K – 12 sector issues in the design and implementation of the statewide K – 20 data and video conference network.
  • Prior to 2000
    • Kitsap Mental Health Services
      • Phone system upgrade implementation project management
        • I provided design review and implementation project management services for Kitsap Mental Health Services for the installation of a new phone system at their Bremerton campus.
    • Northwest Defenders
      • Office cabling projects
        • I provided design and implementation services for Northwest Defenders for the cabling of two of their past three offices.
    • Pagliacci Pizza
      • Call center cabling design and implementation project management
        • I provided engineering and implementation project management services for the cabling of their new corporate office and call center.
        • Move management
        • I provided disaster recovery planning and move management for the move of their voice and data network into their new corporate office and call center.
    • Port Townsend Paper
      • Industrial facility cable replacement design and implementation project management
        • I provided engineering and implementation project management services for the complete re-cabling of the entire paper manufacturing facility.  This included incorporating fiber for the plants’ process control system as well as the cabling for the new old cardboard container recycling facility.
      • Phone system upgrade implementation project management
        • I provided implementation project management services for the replacement of the phone system.
    • Qwest
      • Outside Plant Engineer with wire center responsibilities for aerial, buried, underground, and customer premise design and implementation project management.
        • Spokane
        • Yakima
      • Interoffice Planner and Engineer
      • Central Office Supervisor
    • Seattle University
      • Student Center building design and implementation project management
        • I provided design and implementation project management services for the infrastructure, voice systems, and data systems for the new Student Center at Seattle University.
    • Sound Transit
      • Data center relocation move and disaster recovery planning
        • I provided engineering design review services and disaster recovery planning for the move of the Sound Transit voice and data networks into Union Station.
      • Data center relocation move
        • I assisted in the move of the Sound Transit data network into the new data center in Union Station.
    • Stevedoring Services of America
      • Marine terminal design build project Chitagong, Bangladesh
        • I provided engineering services for the voice and data networks as part of the design build RFP development team.
    • UniSea, Inc. 
      • Office cabling upgrade design and implementation project management
        • I provided engineering and implementation project management for the phone system replacement.
    • Washington State Department of Corrections
      • Washington State Penitentiary
        • I provided engineering design review services for the cable replacement project at this facility.
    • Washington State Historical Society
      • Pacific Avenue Museum cabling and phone system implementation project management
        • I provided implementation project management services for the cabling and phone system installation at the new Pacific Avenue Museum.
      • Stadium Way Museum
        • I provided engineering and implementation project management for the renovation of the Stadium Way Museum.
    • Yakima Valley Memorial Hospital
      • Entrance facility relocation and phone system cutover
        • I provided engineering and implementation project management for the Qwest entrance facility replacement project.